Posted On: Aug 31, 2007 (09:12:26)
What To Include In A Bid Protest

Posted On: Feb 20, 2007 (16:00:12)
WHAT TO INCLUDE IN A BID PROTEST FILING
 
There is no prescribed form for filing a protest. At a minimum, the protest must be in writing. The following list is taken from federal regulations for filing bid protests with the General Accounting office. 4 CFR § 21.1(c)(d) It lists items that must be included in filings with the GAO. It also provides a useful checklist of items to include in most types of bid protests.
 
            The name, street address, e-mail address, and telephone and fax numbers of the protester (or its representative, if any);
            The signature of the protester or its representative;
            The name of the contracting agency;
            The solicitation and/or contract number;
            A detailed statement of the legal and factual grounds of the bid protest, including copies of relevant documents;
            All information needed to establish the fact that the protester is an “interested party”;
            All information establishing the timelines of the protest;
            A request for a ruling on the bid protest, and
            The form of relief requested.
             
The protestor may also choose to include the following:
 
            A request for a protective order (an order that prevents the disclosure of sensitive information except to certain individuals under certain conditions);
            A request for specific documents, and an explanation of the relevancy of the documents to the protest, and/or
            A request for a hearing, with an explanation of the reasons that a hearing is needed to resolve the protest.
 
An “interested party” for purposes of challenging the correct prevailing wage rate has a much broader definition and includes any contractor, or an association representing a contractor, who is likely to seek or to work under a contract containing a particular wage determination, or any laborer or mechanic, or any labor organization which represents a laborer or mechanic, who is likely to be employed or to seek employment under a contract containing a particular wage determination. 29 CFR § 7.
 
Previous                                                                                                                    Next
 
Back to Top of Federal Bid Protests
 
Possible Exceptions to CB

Posted On: Feb 01, 2007 (14:27:45)

POSSIBLE EXCEPTIONS TO COMPETITIVE BIDDING

 

Force Account Limits

 

General Information

 

A “force account” limit is a ceiling imposed by statute on the value of public works projects that a local agency may perform utilizing outside contractors, over which competitive bidding procedures must be used.

 

The purpose of imposing competitive bidding limits is to promote job creation by making sure contractors have an opportunity to bid on new public works jobs. This also guarantees that through competitive bidding, the public gets the best value for every public works dollar that is spent.

 

In California, the precise amounts of the competitive bidding limits vary widely from agency to agency. Some statutes provide that the cost of the “work” triggers the need for competitive bidding. Others provide that the cost of the “contract” triggers the requirement for competitive bidding, which may mean that the agency still has a choice as to whether to utilize competitive bidding or its own employees (force account work).

 

There are at least 30 Public Contract Code sections that pertain to force account limits.  See the case digest for a list of state statutes. Internal link Charter cities may have their own limits with regard to force account work. For a list of California charter city ordinances regarding force account work, please consult the Construction Industry Force Account Council web site.

 

California Courts of Appeal have held that where the statute under which the agency operates requires competitive bidding for all contracts (as opposed to “work”) exceeding the monetary threshold, the agencies have the option of either using competitive bidding or performing the work on force account (using their own employees).   See Construction Indus. Force Account Council v. Amador Water Agency, 71 Cal.App.4th 810 (1999), and Construction Indus. Force Account Council v. Delta Wetlands, 2 Cal.App.4th 1589 (1992).

 

The law is still somewhat unsettled in this area. If a statute indicates that “work” (as opposed to “contracts”) over a specified amount must be awarded via competitive bidding, the outcome could be different than the outcomes in the cases above, where the statutes referred to “contracts” over a particular amount as subject to competitive bidding.

The applicable competitive bidding statute must be carefully analyzed. Slight differences in wording can make a difference in whether or not competitive bidding is required.

 

For more information on the California Uniform Construction Cost Accounting Commission (CUCCAC), which can affect estimates of the cost of public works jobs, click here link to 5-1.

 

 

Emergencies

 

In emergencies, competitive bidding may not be required. The statute governing emergencies under the State Contracts Act (Pub. Con. Code § 10122) permits emergency work on state buildings, roads, bridges, dams, water facilities, reservoirs, etc. to be done by day labor or informal contract, bypassing regular competitive bidding procedures. "Emergency" as defined in Pub. Con. Code § 1102 means a “sudden, unexpected occurrence that poses a clear and imminent danger, requiring immediate action to prevent or mitigate the loss or impairment of life, health, property, or essential public services.

 

A separate statute governs cities (Pub. Con. Code § 22050) and many other state and local entities have specific provisions in their competitive bidding statutes regarding emergency exceptions to competitive bidding. See, statutes re: emergencies.  (MP please link this to the emergency section of the statutes at the end of this section). Generally, most statutes require a four-fifths vote by the agency’s governing board that an emergency exists and that the emergency will not permit the delay that would be caused by competitive bidding. In most of these statutes, the board of the entity making a finding that an emergency exists is required to revisit this decision frequently until the job is completed. Some local agencies also have their own emergency requirements located in their competitive bidding statutes. 

 

A situation isn’t an emergency just because an agency says it is. In Marshall v. Pasadena Unified School District, 119 Cal.App.4th 1241 (2004), the Court of Appeals held that the definition of emergency in the state statute (see Pub. Con. Code §1102) applied to a local school district. The school district’s decision to terminate a construction contract with a company and then to award that contract to a second company without public bidding did not constitute an “emergency” within the meaning of the statute.  In arriving at its decision, the court cited the legislative history of the statute and strong public policy favoring competitive bidding.  The holding in this case means that the definition of emergency work contained in the state statute can be applied to any local entity unless that agency’s statute has some provision which clearly conflicts with the statewide definition. I would delete the cite here and put it above.

 

An emergency is not an emergency just because a government entity says it is. In Marshall, supra , the court determined that a school district’s desire to cancel a contract and award it to another contractor did not constitute an emergency.

 

 

Charter Cities

 

Cities in California are classified as either general law cities (which are governed by state law) or charter cities. The California Constitution gives charter cities autonomy over “municipal affairs” to the extent that the field is not preempted (exclusively governed) by state law.  See Cal. Const., art. XI, § 5, MCM Construction, Inc. v. City and County of San Francisco 66 Cal.App.4th 359 (1998).

 

If a city charter conflicts with state law on a matter of municipal concern, the city charter will prevail. If the charter is silent on any aspect of public contracting, then the Public Contract Code provisions that apply to general law cities will likewise apply to the charter city in question. Pub. Con. Code § 1100.7 If the matter is one of statewide concern and only has a limited effect on municipal affairs, state law will govern. Distinguishing between matters of purely municipal concern and matters of statewide concern can be tricky and may require research into the precedents. However, unless there is an actual conflict between the provisions of the charter and the general requirements of state law, state law will prevail.

For purposes of enforcement of public works law, it is best to treat charter cities like general law cities. Presume that general law applies unless the city raises the charter city defense. For more information on Charter Cities and their competitive bidding thresholds (force account limits) click here.

 

For a useful checklist to help analyze situations involving charter cities, click here link to 5-2.

 

Previous                                                                                                          Next

Back to Top of Calif Competitive Bidding

Back to Top of This Sub-Section

Remedies

Posted On: Feb 07, 2007 (14:22:54)

REMEDIES

 

Findings That Contracts are Unenforceable

 

If a contract is awarded to an entity which is not the lowest responsible bidder, the award of the contract is beyond the scope of authority granted to a public entity (in other words, beyond its legal power) and is therefore void (unenforceable).  Valley Crest Landscape, Inc. v. City Council 41 Cal.App.4th 1432 (1996).  

 

If the public contract is void, the public entity has no authority to pay the contractor.  Miller v. McKinnon, 20 Cal.2d 83 (1942).  In Miller, the California Supreme Court stated that that if a contract is void when awarded because awarding it exceeded the agency’s power, payments made to the contractor may be recovered in a taxpayer’s suit.  Id.  For this reason, experts advise public entities to use caution when confronted with a bid protest that claims that the apparent low bidder is not the lowest responsive, responsible bidder.  The public entity could face a third-party taxpayer suit for illegal payment of public funds if the protestor is correct and the public entity nonetheless moves forward to award the bid to an apparent low bidder who is ultimately found not to be entitled to the award. 

 

 

Award of Contracts

 

Generally, a court will not intervene to actually award a contract to a specific bidder.  Instead the court will order the public agency to follow its own procedures and/or applicable state law.

 

 

Remedies under Injunctions

 

In certain situations injunctions may be appropriate.  For instance, under Bus. & Prof. Code § 7028.4, a licensed contractor or an association of contractors may seek an injunction prohibiting an unlicensed contractor from working on a state project. An injunction generally prohibits a party from acting, or from acting in a particular manner which violates the law, when there is no other practical remedy.

 

 

Writs of Mandate

 

A common remedy for violations of competitive bidding laws is court order to follow the correct interpretation of the law.   [link to Writ of Mandate section.]

 

 

Damages

 

A disgruntled bidder (one who was not awarded the contract) may believe that he or she should have been declared by the public entity to be the lowest responsive, responsible bidder, and therefore should have been awarded the contract.  A bidder who protests the award of the contract to the bidder determined by the public entity to be the lowest responsible bidder may seek damages from the public entity.

               

In Kajima/Ray Wilson v. Los Angeles County Metropolitan Transit Authority, the California Supreme Court permitted the disgruntled bidder to recover bid preparations costs, but not lost profits, on the theory that recovery of bid preparation costs encourages proper challenges to improperly awarded public contracts by the most interested parties, and deters misconduct by public entities.  The Court denied the disgruntled bidder lost profits, reasoning that lost profits are speculative because the lowest bid may be unprofitable for the bidder.  Kajima/Ray Wilson v. Los Angeles County Metropolitan Transit Authority, 23 Cal.4th 305, 320 (2000).

 

Generally damages in bid protests will be limited to bid preparation costs and sometimes attorneys’ fees, and will not cover lost profits.

 

Previous                                                                                                                        Next

Back to Top of Calif Bid Protests

California Sample Letters

Posted On: Oct 20, 2008 (11:27:55)

Labor Headlines: (Updated Every 60 Minutes from Labourstart)

US labour news headlines from LabourStart


15602 visitors since Sep 26, 0606
Action Center
Important Links
DOL Davis Bacon Enforcement
WDOL and Wage Determinations On-Line
GPO Access Davis Bacon (UNOFFICIAL)
DOL District Offices
DOL WHD - Recovery Act
Recovery.gov
Recovery State Contracting Opportunities
Current Federal Regulations
DB Wage Survey FAQ
Archived Federal Regulations
Contractor Past Performance Guide
Federal Agency Labor Advisors
Excluded Parties List
FedBizOpps.gov
National Alliance for Fair Contracting
National Employment Law Project
California Dept. of Industrial Relations
File a California Prevailing Wage Claim
California Prevailing Wage Determinations
DIR Public Works Kit

Visit Unions-America.com!
 Top of Page © Copyright Weinberg, Roger & Rosenfeld, All Rights Reserved.
All materials on this website are licensed to the Alliance for Labor
Standards Education and Training (ALSET), a nonprofit corporation, for
distribution by the copyright holder Weinberg, Roger & Rosenfeld.
Powered By UnionActive™
Hide the Right Hand Column